NSPK - Semua | Rekap NSPK
Kategori | Judul Dokumen | Tahun | Viewed |
---|---|---|---|
Standar Nasional Indonesia Bidang Pengujian |
SNI 03-3642-1994 Metode pengujian kadar residu aspal emulsi dengan penyulingan
Metode pengujian ini meliputi persyaratan pengujian dan ketentuan- ketentuan aspal emulsi kationik dan anionik. 2021-03-09 16:40:03 |
1995 | 168 |
Standar Nasional Indonesia Bidang Pengujian |
SNI 03-3425-1994 Tata cara pelaksanaan lapis tipis beton aspal untuk jalan raya
Tata cara ini membuat uraian tentang persyaratan bahan, persyaratan campuran, peralatan, pelaksanaan dan pengendalian mutu. 2021-03-09 16:52:37 |
1994 | 97 |
Standar Nasional Indonesia Bidang Pengujian |
SNI 03-3640-1994 Metode pengujian kadar beraspal dengan cara ekstraksi menggunakan alat soket
Persyaratan benda uji harus kering, merata, penanggung jawab hasil uji harus jelas. Benda uji yang dipakai 200 gram. Termasuk susunan peralatan ekstrasi. 2021-03-09 16:45:24 |
1994 | 184 |
Standar Nasional Indonesia Bidang Pengujian |
SNI 03-3426-1994 Tata cara survai kerataan permukaan perkerasan jalan dengan alat ukur kerataan naasra
Tata cara ini membuat uraian tentang cara pelaksanaan, pengisian formulir, dan pelaporan survai ini hanya dilakukan pada jalan beraspal, dan jalan beton semen, dengan kondisi rusak ringan ( Tidak berlubang), kondisi baik dan baik sekali. 2021-03-09 16:43:31 |
1994 | 240 |
manual |
Bridge Construction Techniques Manual
This Manual describes a number of matters relating to construction supervision of bridgeworks in Indonesia which most often produce problems for supervision staff. It should be used in conjunction with the Bridge Construction Supervision Manual. 2021-12-15 11:22:49 |
1993 | 328 |
manual |
Bridge Construction Supervision Manual
This Manual describes procedures to be followed for Supervision of Bridge Replacement and Bridge Rehabilitation projects undertaken by the Directorate General of Highways (DGH). Projects are usually carried out by contract but much of the content of this Manual is also applicable to works carried out by force account. 2021-12-15 11:20:50 |
1993 | 1229 |
manual |
Bridge Investigation Manual
The Bridge Investigation Manual describes procedures for bridge investigation which are performed prior to planning, designing and constructing a new bridge. 2021-12-15 10:33:50 |
1993 | 401 |
manual |
Bridge Inspection Manual
The Bridge Inspection Manual describes procedures for carrying out the various inspections in the BMS. In addition, the Manual provides information abaout bridge elements and defects, for the guidance and training of inspectors. 2021-12-15 10:32:41 |
1993 | 546 |
Bidang Lingkungan dan Keselamatan Jalan |
Spesifikasi Perencanaan Lansekap Jalan Pada Persimpangan (02/T/BNKT/1992)
Spesifikasi Perencanaan Lansekap Jalan Pada Persimpangan ini dimaksudkan sebagai pegangan dan petunjuk bagi Pembina Jalan dalam melaksanakan tugasnya yang berkaitan dengan perencanaan lansekap jalan pada persimpangan di dalam Daerah Milik Jalan (DAMIJA), dan bertujuan untuk menyeragamkan perencanaan lansekap jalan pada persimpangan agar didapatkan suatu hasil yang baik dan efisien. 2022-02-21 20:59:15 |
1992 | 477 |
Standar Nasional Indonesia Bidang Pengujian |
SNI 03-2850-1992 Tata cara pemasangan utilitas di jalan
Tata cara ini meliputi persyaratan-persyaratan, ketentuan-ketentuan dan pengerjaan pemasangan utilitas baik pada badan jalan yang meliputi penggalian, penepatan, dan penimbunan kembali, maupun pada bangunan jembatan yang meliputi pemasangan secara menggantung, menempel sebagian atau seluruhnya, yang berkaitan dengan keamanan jalan dan jembatan. 2021-03-04 09:47:23 |
1992 | 604 |