The bridge was completed in 1924. During an indepth inspection of four panels of the main cables in 1991, numerous wires were found broken due to stress corrosion cracking and it was decided rehabilitate the cables by unwrapping, oiling and rewrapping them. It was observed that the broken wire ends were moving further apart as the wedging and oiling progressed - an indeication that the broken w…