The sambonihara Tunnel is on the Tohoku Shinkansen Line. The geology of this tunneling site mainly consists of alternating layers of unconsolidated sandy soil under high hydraulic preassures and cohesive soil. This tunnel was excavated using the NATM, but the tunnel face collapsed twice, preventing the tunnel construction from advancing as scheduled. We therefore conducted an-depth study to dev…