Perpustakaan Direktorat Bina Teknik Jalan dan Jembatan

  • Beranda
  • Informasi
  • Layanan
  • Pilih Bahasa :
    Bahasa Arab Bahasa Bengal Bahasa Brazil Portugis Bahasa Inggris Bahasa Spanyol Bahasa Jerman Bahasa Indonesia Bahasa Jepang Bahasa Melayu Bahasa Persia Bahasa Rusia Bahasa Thailand Bahasa Turki Bahasa Urdu

Pencarian berdasarkan :

SEMUA Pengarang Subjek ISBN/ISSN Pencarian Spesifik

Pencarian terakhir:

{{tmpObj[k].text}}

Ditapis dengan

  • Tahun Penerbitan
    To
  • Ketersediaan
  • Lampiran
  • Tipe Koleksi
  • Format Fisik Dokumen
    Lihat Lebih Banyak
  • Lokasi
  • Bahasa
Ditemukan 140 dari pencarian Anda melalui kata kunci: subject="TUNNELING"
Hal. Awal Sebelumnya 1 2 3 4 5 Berikutnya Hal. Akhir
cover
An impact penetrometer for assessing the cuttability of soft rocks
Komentar Bagikan
Hudson, J.A.

Trrl Lr 685

Ketersediaan1
Tambahkan ke dalam keranjang
Unduh MARCSitasi
cover
Measurements of ground movement and lining behaviour on the London Undergroun…
Komentar Bagikan
Barratt, D.A.

Ketersediaan1
Tambahkan ke dalam keranjang
Unduh MARCSitasi
cover
The tunnelling system for the British section of the Channel tunnel phase II …
Komentar Bagikan
Morgan, J.M.

A 260 m length of the British end of the service tunnel for the Channel tunnel was driven over a period of two and a half months early in 1975. The operation of the tunnelling machine was observed as it advanced through the Lower Chalk and is described in terms of its principal operations, namely cutting, steering, spoil removal and lining. In addition to the normal operation of tunnelling, exp…

Ketersediaan1
Tambahkan ke dalam keranjang
Unduh MARCSitasi
cover
Site investigation for tunnelling trials in chalk
Komentar Bagikan
Priest, S.D.

A site investigation was carried out prior to the tunnelling trials in order to select the best tunnel alignment, predict chalk conditions along this alingment and evaluate the site investigation procedure used. The site investigation consisted of several phases; preliminary investigations, a two stage borehole investigation and measurements made in a 3m diameter shaft. In addition, chalk quali…

Ketersediaan1
Tambahkan ke dalam keranjang
Unduh MARCSitasi
cover
Tunnelling trials in chalk: rock cutting experiments
Komentar Bagikan
Hignett, H.J.

This report presents the results of the performance of arrangments of drag picks and disc cutters cutting through lower chalk during the tunnelling trials at Chinnor, Oxfordshire. Power changes produced by varying the cutter tool type and arrangement on the machine head were recorded and plotted against cutter tool and machine variables. The depth of cut and cutting to relief were fiound to be …

Ketersediaan1
Tambahkan ke dalam keranjang
Unduh MARCSitasi
cover
The effects of ground vibration during bentonite shield tunnelling at Warrington
Komentar Bagikan
New, B.M.

The maximum measured ground vibration (expressed in terms of resultant peak particle velocity) was 3.9 mm/s. The vibration was characterised by random high velocity particle motions resulting from impacts between the machine's disc cutters and glacial boulders in the tunnel face. Surface and subsurface settlement measurements were made along the tunnel line. Laboratory tests and other field dat…

Ketersediaan1
Tambahkan ke dalam keranjang
Unduh MARCSitasi
cover
Hazards in tunnelling and on falsework; proceedings of the Third Internation…
Komentar Bagikan

Ketersediaan1
Tambahkan ke dalam keranjang
Unduh MARCSitasi
cover
Hazards in tunnelling and on falswork; proceedings of the 3rd international s…
Komentar Bagikan

Ketersediaan1
Tambahkan ke dalam keranjang
Unduh MARCSitasi
cover
Engineering aspects on tunnelling works of dam type hydro electric power plan…
Komentar Bagikan
Soedibyo

Ketersediaan1
Tambahkan ke dalam keranjang
Unduh MARCSitasi
cover
The technique of underground tunnelling
Komentar Bagikan
Jonker, J.H.

Ketersediaan5
Tambahkan ke dalam keranjang
Unduh MARCSitasi
Hal. Awal Sebelumnya 1 2 3 4 5 Berikutnya Hal. Akhir
Perpustakaan Direktorat Bina Teknik Jalan dan Jembatan
  • Informasi
  • Layanan

Tentang Kami

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Cari

masukkan satu atau lebih kata kunci dari judul, pengarang, atau subjek

Donasi untuk SLiMS Kontribusi untuk SLiMS?

© 2026 — Senayan Developer Community

Ditenagai oleh SLiMS
Pilih subjek yang menarik bagi Anda
  • Teknik Jalan Teknik Jalan & Geometri
  • Jembatan Jembatan & Terowongan
  • Perkerasan Perkerasan, Aspal & Beton
  • Geoteknik Geoteknik & Fondasi
  • Standar & NSPM NSPM & Standar (SNI/AASHTO)
  • Drainase Drainase & Hidrologi Jalan
  • Lalu Lintas Keselamatan Lalu Lintas
  • Konstruksi Konstruksi & Manajemen
  • Lingkungan & K3 Lingkungan & K3 Jalan
  • Riset Bintekjatan Riset & Prosiding Bintekjatan
Icons made by Freepik from www.flaticon.com
Koleksi Khusus Direktorat Bina Teknik Jalan dan Jembatan
Pencarian Spesifik
Kemana ingin Anda bagikan?