Text
Research on Field Acquisition Data Application in the Rock Tunnel Construction Phase Based on iS3
The Complicated-long Tunnel, with high uncertainty of factors such as geological and environment conditions, may cause major challenges in the design and construction process. Specifically the static data of geological exploration based on traditional design and construction can’t meet the requirements of refined structure design and construction control. Aimed at more refinement services for rock tunnel construction, this paper, describes the whole process application of the dynamical geological information based on the core concept of infrastructure smart service system (iS3). The platform, covers the essential information flow of geology such as data acquisition, processing, expression, analysis and finally helps to offer integrated decision making services for engineer construction.
LOKASI: Ruang Koleksi Umum
Rak: 2
Tidak ada salinan data
Tidak tersedia versi lain