Image of Research on Field Acquisition Data Application in the Rock Tunnel Construction Phase Based on iS3

Text

Research on Field Acquisition Data Application in the Rock Tunnel Construction Phase Based on iS3



The Complicated-long Tunnel, with high uncertainty of factors such as geological and environment conditions, may cause major challenges in the design and construction process. Specifically the static data of geological exploration based on traditional design and construction can’t meet the requirements of refined structure design and construction control. Aimed at more refinement services for rock tunnel construction, this paper, describes the whole process application of the dynamical geological information based on the core concept of infrastructure smart service system (iS3). The platform, covers the essential information flow of geology such as data acquisition, processing, expression, analysis and finally helps to offer integrated decision making services for engineer construction.

LOKASI: Ruang Koleksi Umum
Rak: 2


Ketersediaan

Tidak ada salinan data


Informasi Detail

Judul Seri
Proccedings of GeoShanghai 2018 International Conference: Tunnelling and Underground Construction
No. Panggil
R 624.19 (063) CHE r
Penerbit Springer : Shanghai.,
Deskripsi Fisik
766-774p.: Illus.; 16 x 24 cm
Bahasa
English
ISBN/ISSN
978-981-13-0016-5
Klasifikasi
R 624.19 (063)
Tipe Isi
-
Tipe Media
-
Tipe Pembawa
-
Edisi
-
Subjek
Info Detail Spesifik
-
Pernyataan Tanggungjawab

Versi lain/terkait

Tidak tersedia versi lain




Informasi


DETAIL CANTUMAN


Kembali ke sebelumnyaDetail XMLKutip ini