Image of Ground Surface Deformation Analysis of Quasi Rectangular EPB Shield Tunneling

Text

Ground Surface Deformation Analysis of Quasi Rectangular EPB Shield Tunneling



The first quasi rectangular shield tunnel in China was developed during the construction of Ningbo Metro Line 3. Based on the Mindlin solution, this paper presents the computerized outcome of the ground surface deformation caused by the following three factors: the hirizontal excess pressure at the exavation face, the frictin between the shield skin and soil, and the grouting force outside the tailskin. The result shows: (1) Superposition of these three factors causes large surface heave near the tunneling area, with a maximum of 15 mm; (2) Grouting force plays an absolutely dominant role in ground surface deformation, which can cause a maximum 19 mm ground heave; (3) However, the total ground surface deformation induced by these factors remains controllable. This study can be for used for disturbance of future quisi rectangular shield tunneling.

LOKASI: Ruang Koleksi Umum
Rak: 2


Ketersediaan

Tidak ada salinan data


Informasi Detail

Judul Seri
Proceedings of GeoShanghai 2018 International Conference: Tunnelling and Underground Construction
No. Panggil
624.19 (063) JIA g
Penerbit Springer : Singapore.,
Deskripsi Fisik
103-111p.: Illus.; 18 x 24 cm
Bahasa
English
ISBN/ISSN
978-981-13-0016-5
Klasifikasi
624.19 (063)
Tipe Isi
-
Tipe Media
-
Tipe Pembawa
-
Edisi
-
Subjek
Info Detail Spesifik
-
Pernyataan Tanggungjawab

Versi lain/terkait

Tidak tersedia versi lain




Informasi


DETAIL CANTUMAN


Kembali ke sebelumnyaDetail XMLKutip ini