Detail Cantuman
Pencarian SpesifikText
PTI Evaluation Of The Condition Of A Post-Tensioned Concrete Parking Structure After 15 Years Of Service
In the summer of 1989, a parking structure adjoining an office building in the Inner Harbor area of downtown Baltimore, Maryland, was demolished to make room for an expansion to the existing office tower. This post-tensioned concrete parking structure was built in 1974, and thus, had been in service for 15 years prior to demolition. This report summarizes the observations and evaluation of thegeneral condition of the parking structure prior to demolition and of the unbonded monostrands which were inspected after demolition.
Lokasi: Rak Penelitian 2
(Kode: PTI-008)
Ketersediaan
0000021391 | 625.7(047.31) SUA e | My Library | Tersedia |
Informasi Detail
Judul Seri |
-
|
---|---|
No. Panggil |
625.7(047.31) SUA e
|
Penerbit | Post tensioning institute : Phoenix., 1990 |
Deskripsi Fisik |
-
|
Bahasa |
English
|
ISBN/ISSN |
-
|
Klasifikasi |
625.7(047.31)
|
Tipe Isi |
-
|
Tipe Media |
-
|
---|---|
Tipe Pembawa |
-
|
Edisi |
-
|
Subjek | |
Info Detail Spesifik |
-
|
Pernyataan Tanggungjawab |
-
|
Versi lain/terkait
Tidak tersedia versi lain