Image of PTI Controlled Demolition Of An Unbonded Post-Tensioned Concrete Slab

Text

PTI Controlled Demolition Of An Unbonded Post-Tensioned Concrete Slab



This report describes the controlled demolition of 100,000 square feet of post-tensioned slab, which was necessitated by suspicion of damage due to fire. The saw cuttings procedure was used to neutralize over 900 post tensioned tendons. The neutralization of the tendons was programmed to reveal information on response of live and in-place tendons to saw cutting. Observations made are described and tabulated. Steps taken to integrate theretained portions of the building with new construction are described. The work illustrates that, if required, slabs constructed with unbonded posttensioned tendons can safely and readily be dismantled. The report concludes with recommendations for demolition of similar projects.
Lokasi: Rak Penelitian 2
(Kode: PTI-001)


Ketersediaan

0000021387625.7 (047.31) PTI cMy LibraryTersedia

Informasi Detail

Judul Seri
-
No. Panggil
625.7 (047.31) FLO c
Penerbit Post tensioning institute : Farmington Hills.,
Deskripsi Fisik
p.29
Bahasa
English
ISBN/ISSN
-
Klasifikasi
625.7 (047.31)
Tipe Isi
-
Tipe Media
-
Tipe Pembawa
-
Edisi
-
Subjek
Info Detail Spesifik
-
Pernyataan Tanggungjawab

Versi lain/terkait

Tidak tersedia versi lain




Informasi


DETAIL CANTUMAN


Kembali ke sebelumnyaDetail XMLKutip ini