No image available for this title

Text

Trial Works on Soil Consolidation Before Tunnel Construction



This paper describes the results of the trial workd conducted in a test area, which is a part of Krasnopresnensky prospect including an automobile tunnel combined with one of the metro lines that are being built in Moscow. The objective of these works was to detemine the technological regularity of soil consolidation before inter-tunnel connections are friven. Basics of the injection technology were checked in the laboratory. From the results, the composition and penetrating capacity of the injected micro-cement grout suspension were determinated. The injection and control works in the test area have indicated that the ground may be successfully fixed by appying a manchette injection method of micro-cement-based grout.
LOKASI:
Ruang Koleksi Umum
Rak: 2


Ketersediaan

Tidak ada salinan data


Informasi Detail

Judul Seri
Proceedings Geotechnical Aspects of Underground Construction in Soft Ground
No. Panggil
624.121 (063)
Penerbit Taylor & Francis Group, : London.,
Deskripsi Fisik
351-357p.
Bahasa
English
ISBN/ISSN
0-415-39124-5
Klasifikasi
624.121 (063)
Tipe Isi
-
Tipe Media
-
Tipe Pembawa
-
Edisi
-
Subjek
Info Detail Spesifik
-
Pernyataan Tanggungjawab

Versi lain/terkait

Tidak tersedia versi lain




Informasi


DETAIL CANTUMAN


Kembali ke sebelumnyaDetail XMLKutip ini