Perpustakaan Direktorat Bina Teknik Jalan dan Jembatan

  • Beranda
  • Informasi
  • Layanan
  • Pilih Bahasa :
    Bahasa Arab Bahasa Bengal Bahasa Brazil Portugis Bahasa Inggris Bahasa Spanyol Bahasa Jerman Bahasa Indonesia Bahasa Jepang Bahasa Melayu Bahasa Persia Bahasa Rusia Bahasa Thailand Bahasa Turki Bahasa Urdu

Pencarian berdasarkan :

SEMUA Pengarang Subjek ISBN/ISSN Pencarian Spesifik

Pencarian terakhir:

{{tmpObj[k].text}}
No image available for this title
Penanda Bagikan

Text

Control of Contaminated Groundwater During Tunnel Excavation

Munfah, N.A. - Nama Orang; Butler, J. - Nama Orang;

With budget of $6.3Billio4=u74n the East Side Access Project (ESA) is the largest transportation project ever undertaken in New York City. The construction of the project will require significant tunnelling and underground work utilizing a variety of construction techniques. In Queens, the project will require the construction of four soft ground tunels, Using pressurized face TBM. The tunnels will be constructed under an active rairoad yard and the main line of the Long Island Rail Road (LIRR). In addition, cut and cover tunnels and underpinning of existing transit lines will be required. In Manhattan the project requires the construction of serveraltunels and two large station caverns in rock. The project faces unique geotechnical and environmental conditions within the soft-ground tunnel portion of the project located in Sunnyside Yard and Harold Interlocking-mixed face tunnel excavation, a variety of groundwater contamination plumes, as well as tunnelling through a New York State-listed Class II inactive hazardous waste site. This paper focuses on the techical challenges in the Queens segment and particularly the innovative construction and monitoring approaches identified to control movement of contaminated ground water. It addresses engineering aspects, public amenities, railroad operation, environmental issues, and technical challenges related to underground construction in a heavily developed railroad yard site while maintaining the existing facilities operational and with minimal imact on the public health and safety.
LOKASI:
Ruang Koleksi Umum
Rak: 2


Ketersediaan

Tidak ada salinan data

Informasi Detail
Judul Seri
Proceedings Geotechnical Aspects of Underground Construction in Soft Ground
No. Panggil
624. 121 (063)
Penerbit
London : Taylor & Francis Group,., 2006
Deskripsi Fisik
265-271p.
Bahasa
English
ISBN/ISSN
0-415-39124-5
Klasifikasi
624. 121 (063)
Tipe Isi
-
Tipe Media
-
Tipe Pembawa
-
Edisi
-
Subjek
TUNNEL
Info Detail Spesifik
-
Pernyataan Tanggungjawab
-
Versi lain/terkait

Tidak tersedia versi lain

Lampiran Berkas
Tidak Ada Data
Komentar

Anda harus masuk sebelum memberikan komentar

Perpustakaan Direktorat Bina Teknik Jalan dan Jembatan
  • Informasi
  • Layanan

Tentang Kami

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Cari

masukkan satu atau lebih kata kunci dari judul, pengarang, atau subjek

Donasi untuk SLiMS Kontribusi untuk SLiMS?

© 2026 — Senayan Developer Community

Ditenagai oleh SLiMS
Pilih subjek yang menarik bagi Anda
  • Teknik Jalan Teknik Jalan & Geometri
  • Jembatan Jembatan & Terowongan
  • Perkerasan Perkerasan, Aspal & Beton
  • Geoteknik Geoteknik & Fondasi
  • Standar & NSPM NSPM & Standar (SNI/AASHTO)
  • Drainase Drainase & Hidrologi Jalan
  • Lalu Lintas Keselamatan Lalu Lintas
  • Konstruksi Konstruksi & Manajemen
  • Lingkungan & K3 Lingkungan & K3 Jalan
  • Riset Bintekjatan Riset & Prosiding Bintekjatan
Icons made by Freepik from www.flaticon.com
Koleksi Khusus Direktorat Bina Teknik Jalan dan Jembatan
Pencarian Spesifik
Kemana ingin Anda bagikan?