No image available for this title

Text

Settlement Behaviour of a Shield Tunnel Constructed in Subsiding Reclaimed Area



This paper focuses on a large settlement behaviour of a shield tunnel, which is constructed in soft alluvial clay strata beneath fresh reclaimed land. The total settlement of the tunnel is more than 0.73 metres and the deformation takes place over more than twenty years after the completion of the tunnel construction. Three dimensional finite element analyses have been carried out to estimate a long-term behaviour of soil and tunnel structure observed in this field. The computed vertical settlement of tunnel structure is compared with the measured data.
LOKASI:
Ruang Koleksi Umum
Rak: 2


Ketersediaan

Tidak ada salinan data


Informasi Detail

Judul Seri
Proceedings Geotechnical Aspects of Underground Construction in Soft Ground
No. Panggil
624.121 (063)
Penerbit Taylor & Francis Group, : London.,
Deskripsi Fisik
239-245p.
Bahasa
English
ISBN/ISSN
0-415-39124-5
Klasifikasi
624.121 (063)
Tipe Isi
-
Tipe Media
-
Tipe Pembawa
-
Edisi
-
Subjek
Info Detail Spesifik
-
Pernyataan Tanggungjawab

Versi lain/terkait

Tidak tersedia versi lain




Informasi


DETAIL CANTUMAN


Kembali ke sebelumnyaDetail XMLKutip ini