No image available for this title

Text

The Effects of Tunnelling on Piled Strutures on the CTRL



The construction of the tunnel for the Channel Tunnel Rail Link (CTRL) project in London afforded the opportunity to obtain valuable case studies on the effects of tunnelling on piled foundations. The tunnel alignment was generally set to avoid interaction with overhead structure, but due to the depth of penetration of the piles supporting major bridges, tunnelling had to be carried out relatively close to the piled foundations of the bridges. This paper describes three case studies, briefly describing the assessments carried out prior to tunnelling under these bridges in London as well as selected monitoring results obtained as the tunnels advanced underneath the bridges.
LOAKSI:
Ruang Koleksi Umum
Rak


Ketersediaan

Tidak ada salinan data


Informasi Detail

Judul Seri
Proceeding Geotechnical Aspects of Underground Construction in Soft Ground
No. Panggil
624.121 (063)
Penerbit Taylor & Francis Group, : London.,
Deskripsi Fisik
115-123p.
Bahasa
English
ISBN/ISSN
0-415-39124-5
Klasifikasi
624.121 (063)
Tipe Isi
-
Tipe Media
-
Tipe Pembawa
-
Edisi
-
Subjek
Info Detail Spesifik
-
Pernyataan Tanggungjawab

Versi lain/terkait

Tidak tersedia versi lain




Informasi


DETAIL CANTUMAN


Kembali ke sebelumnyaDetail XMLKutip ini