No image available for this title

Computer Software

Forth Road Bridge - first internal inspection, strength evaluation, acoustic monitoring and dehumidification of the main cables



The Forth Road Bridge was opened to traffic in 1964. Following work carried out as part of the development of the NCHRP guidelines, the Forth estuary Transport Authority (FETA), the owners and operaors of the crossing, took the decision in 2003 to carry out a first internal inspection of both main cables. The inspection revealed that there was significant corrosion within the main cables. This paper describes that inspection, results and the evaluation of the current and predicted future strength of the cable. Following the inspection, a decision and the current status of this work is also described


Ketersediaan

0000018360624.21(063) Col fMy LibraryTersedia

Informasi Detail

Judul Seri
Advances In Cable-supported Bridges
No. Panggil
624.21(063) Col f
Penerbit Taylor & Francis : .,
Deskripsi Fisik
pp. 201-214
Bahasa
English
ISBN/ISSN
-
Klasifikasi
624.21(063)
Tipe Isi
-
Tipe Media
-
Tipe Pembawa
-
Edisi
-
Subjek
Info Detail Spesifik
-
Pernyataan Tanggungjawab

Versi lain/terkait

Tidak tersedia versi lain




Informasi


DETAIL CANTUMAN


Kembali ke sebelumnyaDetail XMLKutip ini