Repainting of Seto-Ohashi bridge for increase of durability



The bridge mainly comprised of steel structures is in a severe corrosive environment. Therefore, the heavy duty coating system is used to prevent corrosion. The bridge has served for 18 years since the opening, and allover repainting program, which makes LCC minimum, started with modified paint system for 1,800,000m2 of repainting area. In order to develop the repainting schedule, the thorough coating inspections to grasp the deteriorated condition and the prediction of the coating exhaustion were implemented. Then, the priority and the timing of repainting were determined based on the results. The careful quality control is conducted to obtain the high quality coating film in the field repainting work


Ketersediaan

0000018332624.21(063) Kaw rMy LibraryTersedia

Informasi Detail

Judul Seri
Advances In Cable-supported Bridges
No. Panggil
624.21(063) Kaw r
Penerbit Francis & Taylor : .,
Deskripsi Fisik
pp. 97-110
Bahasa
English
ISBN/ISSN
-
Klasifikasi
624.21(063)
Tipe Isi
-
Tipe Media
-
Tipe Pembawa
-
Edisi
-
Subjek
Info Detail Spesifik
-
Pernyataan Tanggungjawab

Versi lain/terkait

Tidak tersedia versi lain




Informasi


DETAIL CANTUMAN


Kembali ke sebelumnyaDetail XMLKutip ini