No image available for this title

Text

ACI 345R-91: Guide For Concrete Highway Bridge Deck Construction



The durability and maintenance costs of concrete highway bridge decks are highly dependent upon the care excercised during the consstruction phase, including attendant activities during the preconstruction and post construction periods. recommendations relative to these periods are presented, covering the areas of design considerations, inspection, preconstruction planning, falsework and formwork, reinforcement, concrete materials and properties, measuring and mixing, placing and consolidation, finishing, curing, post construction care and the use of overlays.

Lokasi: Lemari Referensi
RF.22


Ketersediaan

0000017626624.21.095.33(036) ACI gMy LibraryTersedia
0000017780624.21.095.33(036) ACI gMy LibraryTersedia

Informasi Detail

Judul Seri
ACI Manual Of Concrete Practice, Part 3
No. Panggil
R 625.745.1(036) AME g
Penerbit American Concrete Institute : America.,
Deskripsi Fisik
38p.: Illus.; 20,5 x 29 cm
Bahasa
English
ISBN/ISSN
-
Klasifikasi
R 625.745.1(036)
Tipe Isi
-
Tipe Media
-
Tipe Pembawa
-
Edisi
-
Subjek
Info Detail Spesifik
-
Pernyataan Tanggungjawab

Versi lain/terkait

Tidak tersedia versi lain




Informasi


DETAIL CANTUMAN


Kembali ke sebelumnyaDetail XMLKutip ini