Conversion of rural and semi rural major/minor T junctions to offside priority
Trrl Lr 883
Flow and delay data obtained at five major/minor T-junctions before and after conversion to offside-priority have been used to provide general criteria for conversion of major/minor systems to mini-roundabouts. Two approaches have been adopted. The first is intended to provide an approximate method of estimating the 24-hour delays before and after conversion and the second criterion defines a'guideline' flow is the flow through the mini-roundabout required to generate delays equal to those actual flow is less than the 'guideline'. Although these generalised criteria have some limitations and prompt further research in related areas, they offer guidelines to the question of junction choice. Application details for both procedures are given.
Ketersediaan
0000001608 | 625.7(047.31)6bMar c | My Library | Tersedia |
Informasi Detail
Judul Seri |
Trrl Lr 883
|
---|---|
No. Panggil |
625.7(047.31)6bMar c
|
Penerbit | TRRL : ., 1979 |
Deskripsi Fisik |
24 p.; fig.; tab.
|
Bahasa |
Indonesia
|
ISBN/ISSN |
-
|
Klasifikasi |
625.7(047.31)6bMar
|
Tipe Isi |
-
|
Tipe Media |
-
|
---|---|
Tipe Pembawa |
-
|
Edisi |
-
|
Subjek | |
Info Detail Spesifik |
-
|
Pernyataan Tanggungjawab |
-
|
Versi lain/terkait
Tidak tersedia versi lain