The effects of ground vibration during bentonite shield tunnelling at Warrington



The maximum measured ground vibration (expressed in terms of resultant peak particle velocity) was 3.9 mm/s. The vibration was characterised by random high velocity particle motions resulting from impacts between the machine's disc cutters and glacial boulders in the tunnel face. Surface and subsurface settlement measurements were made along the tunnel line. Laboratory tests and other field data showed that the ground in this area was likely to settle at levels of vibration lower than those measured from the tunnelling machine. Vibration from the excavation process probably caused ground compaction which contributed significantly to ground settlement and its effects. The vibration was not likely to have caused any direct damage by dynamic stressing but the associated low level noise did cause concern among local residents


Ketersediaan

0000001596625.7(047.31) New eMy LibraryTersedia

Informasi Detail

Judul Seri
Trrl Lr 860
No. Panggil
625.7(047.31) New e
Penerbit TRRL : .,
Deskripsi Fisik
18 p.; fig.; tab.
Bahasa
Indonesia
ISBN/ISSN
-
Klasifikasi
625.7(047.31)
Tipe Isi
-
Tipe Media
-
Tipe Pembawa
-
Edisi
-
Subjek
Info Detail Spesifik
-
Pernyataan Tanggungjawab

Versi lain/terkait

Tidak tersedia versi lain




Informasi


DETAIL CANTUMAN


Kembali ke sebelumnyaDetail XMLKutip ini