Proceedings of the Eastern Asia Society for Transportation Studies, volume 2
The cutter ring breakage as a cutter failure mode in shield tunnel construction is more likely to occur in the centre zone of cutterhead. Given the inconsistence of this phenomenon with the linear cutting theory, the present paper suggests the use of the circular cutting theory to explain the cutter ring breakage and find the correlation between the unbalanced side force and cutter ring breakag…
TRR 1159 Prefabricated Vertical Drains and Pavement Drainage Systems
Stability and Performance of Slopes and Embankments
Stability and Performance of Slopes and Embankments