Trr No. 1171 Asphalt Materials And Mixtures, pp. 12-17 The modifiedx version is a practical substitute for its former version that was based on longer immersion periods (up to 14 days) and a greater number of sample sets (five versus three neede by the current procedure). The development of the test was supported by laboratory and initial field experience, as well as by theoretical considerati…
Trr No. 1436 Materials And Construction, pp. 54-59
Trr No. 1436 Materials And Construction, pp. 83-87
7th REAAA Conference - Proceedings-vol. I.
LOKASI: Ruang Koleksi Umum Rak: 4
Proceedings of the Conference on Analysis and design in geotechnical engineering, volume 1
Optimum use of engineering talent; meeting the need for technical personnel