LOKASI: Rak Penelitian 2
Trrl Lr 875 Attitude surveys carried out three and six months after the opening of the cycle routes indicated that most residents on the cycle routes considered that they had been unaffected by the scheme or were actively in favour of it. Most cyclists were in favour of the cycle routes, but there was much criticism from them of motorists ignoring traffic signs along the routes and of their …
Trrl Lr 904 The report describes the results of traffic studies carried out up to 12 months after the opening of the experiment and of travel and attitude surveys carried out up to 6 months after opening. Accident data collected over 6 months were insufficient to enable any conclusions to be drwn on the effect of the routes on the safety of cyclists. Though cycle use was no significantly cha…