LOKASI: Ruang Koleksi Umum Rak 2
The model tests on the interaction between new constructions and adjacent existing buildings were summarized and analyzed from four aspects: the preparation methods of the model soil, the selection of pile model and tunnel model, the simulation methods of excavation process, and the loading methods of model tests. Several conclusions can be drawn as follows: (I) the influence of the superstruct…
Using the practice of Ningbo high-speed railway station transportation hub as an example, we studied and reported on the key technologies for the construction of an urban railway transportation hub that integrated the functionalities and structures of a railway, subway, city bus, and taxi stations for traffic and passenger transportation. Specifically, we first studied the impact of deep founda…
LOKASI: Ruang Koleksi Umum Rak 2
The cutter ring breakage as a cutter failure mode in shield tunnel construction is more likely to occur in the centre zone of cutterhead. Given the inconsistence of this phenomenon with the linear cutting theory, the present paper suggests the use of the circular cutting theory to explain the cutter ring breakage and find the correlation between the unbalanced side force and cutter ring breakag…
Trr No. 1418 Soils, Geology, And Foundations; Materials And Construction, pp. 30-34
7th REAAA - Conference Proceedings-vol. I.
The fourth conference of The Road engineering Association of Asia and Australasia, volume 1Planning, pp. 443-458