The model tests on the interaction between new constructions and adjacent existing buildings were summarized and analyzed from four aspects: the preparation methods of the model soil, the selection of pile model and tunnel model, the simulation methods of excavation process, and the loading methods of model tests. Several conclusions can be drawn as follows: (I) the influence of the superstruct…
Using the practice of Ningbo high-speed railway station transportation hub as an example, we studied and reported on the key technologies for the construction of an urban railway transportation hub that integrated the functionalities and structures of a railway, subway, city bus, and taxi stations for traffic and passenger transportation. Specifically, we first studied the impact of deep founda…
LOKASI: Ruang Koleksi Umum Rak 2
The cutter ring breakage as a cutter failure mode in shield tunnel construction is more likely to occur in the centre zone of cutterhead. Given the inconsistence of this phenomenon with the linear cutting theory, the present paper suggests the use of the circular cutting theory to explain the cutter ring breakage and find the correlation between the unbalanced side force and cutter ring breakag…
TRR 1260 Pavement Design, Management And Performance, pp.125 Response-type road roughness measuring (RTRRM) systems have been widely used in United States and internationally in the evaluation of pavement surface roughness. One of the major problems associated with the calibration and operation of RTRRM systems has been the speed dependence of the systems. A reporting statistic from an RTRRM s…
Second International Conference On Road & Airfield Pavement Technology, Volume 1
LOKASI: Ruang Koleksi Umum Rak: 2