The cutter ring breakage as a cutter failure mode in shield tunnel construction is more likely to occur in the centre zone of cutterhead. Given the inconsistence of this phenomenon with the linear cutting theory, the present paper suggests the use of the circular cutting theory to explain the cutter ring breakage and find the correlation between the unbalanced side force and cutter ring breakag…
The additional pile response due to the creep behavior of the soil is disadvantageous to the safety of pile. However, in the current studies for considering the creep behavior of the soft soil, the pile response induced by the long-term settlement of soil is seldom investigated. This paper mainly discusses the pile response during the excavation and operation periods considering the creep behav…
LOKASI: Ruang Koleksi Umum Rak 3
LOKASI: Ruang Koleksi Umum Rak: 3
Proceedings of sessions of GeoShanghai 2010, held in Shanghai, China, June 3-5, 2010. Hosted by Tongji University, China; Shanghai Society of Civil Engineering, China; Chinese Institution of Soil Mechanics and Geotechnical Engineering, China. In cooperation with Alaska University Transportation Center, USA; Geo-Institute of ASCE, USA; Deep Foundation Institute, USA; East China Architectural Des…
International Seminar On Bridge Engineering And Management In Asian Countries. Technical Paper
Proceedings Of The First International Conference On Computing In Civil Engineering