The cutter ring breakage as a cutter failure mode in shield tunnel construction is more likely to occur in the centre zone of cutterhead. Given the inconsistence of this phenomenon with the linear cutting theory, the present paper suggests the use of the circular cutting theory to explain the cutter ring breakage and find the correlation between the unbalanced side force and cutter ring breakag…
The additional pile response due to the creep behavior of the soil is disadvantageous to the safety of pile. However, in the current studies for considering the creep behavior of the soft soil, the pile response induced by the long-term settlement of soil is seldom investigated. This paper mainly discusses the pile response during the excavation and operation periods considering the creep behav…
LOKASI: Ruang Koleksi Umum Rak 3
the purpose of this handbook is to provide a reference book of principles, processes and data for those interested in the application of technology to highway transportation . The 1950 to 1970 peroid produced significant changes in highway engineering. The advant of the modern toll roads and interstate highway programs produced new demands upon enginners responsible for planning, design, constr…
LOKASI: Ruang Koleksi Umum Rak: 2