  <title>An Alternative Method for Soil Characterisation Using Pipe-Jacking Parameters and Spoil Charactertics</title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>Cheng, Wen-chieh.</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <name type="Personal Name" authority="">
  <namePart>Ge, Louis</namePart>
  <role>
   <roleTerm type="text">Additional Author</roleTerm>
  </role>
 </name>
 <name type="Personal Name" authority="">
  <namePart>Ni, James. C.</namePart>
  <role>
   <roleTerm type="text">Additional Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Shanghai</placeTerm>
  </place>
  <publisher>Springer</publisher>
  <dateIssued>2018</dateIssued>
 </originInfo>
 <language>
  <languageTerm type="code">en</languageTerm>
  <languageTerm type="text">English</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Text</form>
  <extent>224-231p.: Illus.; 18 x 24 cm</extent>
 </physicalDescription>
 <relatedItem type="series">
  <titleInfo/>
  <title>Proceedings of GeoShanghai 2018 International Conference: Tunnelling and Underground Construction</title>
 </relatedItem>
 <note>As only a few boreholes are present along a tunnel design alignment, geological understanding of the worksite may not be adequate and the ability to optimise the tunnelling parameters is thus limited. Since this lack of boreholes will cause a significant potential of geo-hazards for tunnelling works. This study proposes an alternative method to determine the major and other proportions of ground. The variation of the torque of the cutter wheel and sieve residue can be utilised to de-termine the major ground proportion, whereas the flow rate of the supply line and pressure in the supply and discharge lines, as well as the density of bentonite slurry can be utilised to determine other proportions. The validity of the proposed method is verified by a case study. The proposed method provides an opportunity to better understand the geological structure of worksite, refining the design tun-nelling parameters and minimising the potential of geo-hazards.&#13;
&#13;
LOKASI: Ruang Koleksi Umum&#13;
Rak: 2</note>
 <note type="statement of responsibility"></note>
 <subject authority="">
  <topic>TUNNELLING</topic>
 </subject>
 <classification>624.19 (063)</classification>
 <identifier type="isbn">9789811300165</identifier>
 <location>
  <physicalLocation>Perpustakaan Direktorat Bina Teknik Jalan dan Jembatan Direktorat Jenderal Bina Marga - Kementerian Pekerjaan Umum (NPP: 3273244A00000001)</physicalLocation>
  <shelfLocator>624.19 (063) CHE a</shelfLocator>
 </location>
 <slims:image>procee.jpg.jpg</slims:image>
 <recordInfo>
  <recordIdentifier>24029</recordIdentifier>
  <recordCreationDate encoding="w3cdtf">2023-06-16 10:28:11</recordCreationDate>
  <recordChangeDate encoding="w3cdtf">2023-06-16 10:28:11</recordChangeDate>
  <recordOrigin>machine generated</recordOrigin>
 </recordInfo>
</mods>
</modsCollection>