Gaya APA

Zhu, B., Frangopol, D. (2016). Time – Variant Risk Assessment of Bridges with Partially and Fully Closed Lanes due to Traffic Loading and Scour (Volume 21, issue 6, 2016). America: ASCE Library.

Gaya MLA

Zhu, Benjin., Frangopol, D. "Time – Variant Risk Assessment of Bridges with Partially and Fully Closed Lanes due to Traffic Loading and Scour". Volume 21, issue 6, 2016 America: ASCE Library, 2016. Text.