Gaya APA
Chai, Y, H., Hung, H, J. (2016).
Waiting Period for Closure Pours in Bridge Widening or Staged Construction (Volume 21, issue 5).
America:
ASCE Library.
Gaya MLA
Chai, Y., H.., Hung, H., J..
"Waiting Period for Closure Pours in Bridge Widening or Staged Construction".
Volume 21, issue 5
America:
ASCE Library,
2016.
Text.