No image available for this title

Text

Ground Movement Control in the Construction of a New Metro Line in Barcelona



Ground movement control is of paramount imporance in the construction of a new Metro line in Barcelona gven the large diameter of the excavation and the need to cross heavily built areas. A bariety of construction procedures for ground movement control are envisaged. In the paper three examples from the early part of the project are descrbed. They involve: (i) the installation of a screen of jet grouted columns, (ii) compensation grouting, and (iii) structural jacking.
LOKASI:
Ruang Koleksi Umum
Rak: 2


Ketersediaan

Tidak ada salinan data


Informasi Detail

Judul Seri
Proceedings Geotechnical Aspects of Underground Construction in Soft Ground (R)
No. Panggil
624.121 (063)
Penerbit Taylor & Francis Group, : London.,
Deskripsi Fisik
389-397p.
Bahasa
English
ISBN/ISSN
0-415-39124-5
Klasifikasi
624.121 (063)
Tipe Isi
-
Tipe Media
-
Tipe Pembawa
-
Edisi
-
Subjek
Info Detail Spesifik
-
Pernyataan Tanggungjawab

Versi lain/terkait

Tidak tersedia versi lain




Informasi


DETAIL CANTUMAN


Kembali ke sebelumnyaDetail XMLKutip ini