<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="20471">
 <titleInfo>
  <title>TUNNELLING UNDER THE CITY CENTRE OF ANTWERP:</title>
  <subTitle>A New Underground Railway Link for the HSL Paris-Brussels-Amsterdam</subTitle>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>Christiaens, M.</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <name type="Personal Name" authority="">
  <namePart>Hemerijckx, E.</namePart>
  <role>
   <roleTerm type="text">Additional Author</roleTerm>
  </role>
 </name>
 <name type="Personal Name" authority="">
  <namePart>Vereerstraeten, J.-C.</namePart>
  <role>
   <roleTerm type="text">Additional Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">London</placeTerm>
  </place>
  <publisher>Taylor &amp; Francis Group,</publisher>
  <dateIssued>2006</dateIssued>
 </originInfo>
 <language>
  <languageTerm type="code">en</languageTerm>
  <languageTerm type="text">English</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Text</form>
  <extent>383-389p.</extent>
 </physicalDescription>
 <relatedItem type="series">
  <titleInfo/>
  <title>Proceedings Geotechnical Aspects of Underground Construction in Soft Ground (R)</title>
 </relatedItem>
 <note>The most important structure of the Antwero north-south railway link, situated on the high speed line Paris-Brussels-Amsterdam, is definitely the twin-tube tunnel of 1,225m length and 8.00m diameter which has bored in dense – slightly silty – sands, under the old city centre, between the “Koningin Astrid” and the “Dam” squares. During the design hase, as well as during the construction phase of the tunnel, constant care was taken to limit subsidence in this sensitive urban area. This required the combination of traditional underground construction techniques, such as galleries, “sheeted trenches”, grout injections, pipe-jacked roof, jacked tubes . . . with the boring process itself using a slurry type Tunnel Boring Machine (TBM).&#13;
LOKASI:&#13;
Ruang Koleksi Umum&#13;
Rak: 2</note>
 <note type="statement of responsibility"></note>
 <subject authority="">
  <topic>UNDERGROUND</topic>
 </subject>
 <classification>624. 121(063)</classification>
 <identifier type="isbn">0415391245</identifier>
 <location>
  <physicalLocation>Perpustakaan Direktorat Bina Teknik Jalan dan Jembatan Direktorat Jenderal Bina Marga - Kementerian Pekerjaan Umum (NPP: 3273244A00000001)</physicalLocation>
  <shelfLocator>624. 121(063)</shelfLocator>
 </location>
 <recordInfo>
  <recordIdentifier>20471</recordIdentifier>
  <recordCreationDate encoding="w3cdtf">2016-04-29 10:31:21</recordCreationDate>
  <recordChangeDate encoding="w3cdtf">2021-05-17 09:36:12</recordChangeDate>
  <recordOrigin>machine generated</recordOrigin>
 </recordInfo>
</mods>
</modsCollection>