Detail Cantuman
Pencarian SpesifikText
Compensastion Grouting for TBM Tunnelling Beneath Shallow-Cover
The last section of the first bored running tunel of the Porto Light Metro was excavated through weak residual soil, 2.5 to 4.0m below sensitive buldings. To minimise the risk of damagem a pre-treatment consisting of sub-horizontal micropiles and grout injection was performed from two shafts. Injections continued both during and after the passage of the TBM. A real-time web-hosted GIS-based monitoring system was set up for relaying both movemens and TBM parameters continuously during tunnel construction.
LOKASI:
Ruang Koleksi Umum
Rak: 2
Ketersediaan
Tidak ada salinan data
Informasi Detail
Judul Seri |
Proceedings Geotechnical Aspects of Underground Construction in Soft Ground (R)
|
---|---|
No. Panggil |
624.121 (063)
|
Penerbit | Taylor & Francis Group, : London., 2006 |
Deskripsi Fisik |
377-383p.
|
Bahasa |
English
|
ISBN/ISSN |
0-415-39124-5
|
Klasifikasi |
624.121 (063)
|
Tipe Isi |
-
|
Tipe Media |
-
|
---|---|
Tipe Pembawa |
-
|
Edisi |
-
|
Subjek | |
Info Detail Spesifik |
-
|
Pernyataan Tanggungjawab |
-
|
Versi lain/terkait
Tidak tersedia versi lain