No image available for this title

Text

Compensastion Grouting for TBM Tunnelling Beneath Shallow-Cover



The last section of the first bored running tunel of the Porto Light Metro was excavated through weak residual soil, 2.5 to 4.0m below sensitive buldings. To minimise the risk of damagem a pre-treatment consisting of sub-horizontal micropiles and grout injection was performed from two shafts. Injections continued both during and after the passage of the TBM. A real-time web-hosted GIS-based monitoring system was set up for relaying both movemens and TBM parameters continuously during tunnel construction.
LOKASI:
Ruang Koleksi Umum
Rak: 2


Ketersediaan

Tidak ada salinan data


Informasi Detail

Judul Seri
Proceedings Geotechnical Aspects of Underground Construction in Soft Ground (R)
No. Panggil
624.121 (063)
Penerbit Taylor & Francis Group, : London.,
Deskripsi Fisik
377-383p.
Bahasa
English
ISBN/ISSN
0-415-39124-5
Klasifikasi
624.121 (063)
Tipe Isi
-
Tipe Media
-
Tipe Pembawa
-
Edisi
-
Subjek
Info Detail Spesifik
-
Pernyataan Tanggungjawab

Versi lain/terkait

Tidak tersedia versi lain




Informasi


DETAIL CANTUMAN


Kembali ke sebelumnyaDetail XMLKutip ini