<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="20470">
 <titleInfo>
  <title>Compensastion Grouting for TBM Tunnelling Beneath Shallow-Cover</title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>Chiriotti, E.</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <name type="Personal Name" authority="">
  <namePart>Avagnina, N.</namePart>
  <role>
   <roleTerm type="text">Additional Author</roleTerm>
  </role>
 </name>
 <name type="Personal Name" authority="">
  <namePart>Grasso, P.</namePart>
  <role>
   <roleTerm type="text">Additional Author</roleTerm>
  </role>
 </name>
 <name type="Personal Name" authority="">
  <namePart>Tripoli, G.</namePart>
  <role>
   <roleTerm type="text">Additional Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">London</placeTerm>
  </place>
  <publisher>Taylor &amp; Francis Group,</publisher>
  <dateIssued>2006</dateIssued>
 </originInfo>
 <language>
  <languageTerm type="code">en</languageTerm>
  <languageTerm type="text">English</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Text</form>
  <extent>377-383p.</extent>
 </physicalDescription>
 <relatedItem type="series">
  <titleInfo/>
  <title>Proceedings Geotechnical Aspects of Underground Construction in Soft Ground (R)</title>
 </relatedItem>
 <note>The last section of the first bored running tunel of the Porto Light Metro was excavated through weak residual soil, 2.5 to 4.0m below sensitive buldings. To minimise the risk of damagem a pre-treatment consisting of sub-horizontal micropiles and grout injection was performed from two shafts. Injections continued both during and after the passage of the TBM. A real-time web-hosted GIS-based monitoring system was set up for relaying both movemens and TBM parameters continuously during tunnel construction.&#13;
LOKASI:&#13;
Ruang Koleksi Umum&#13;
Rak: 2</note>
 <note type="statement of responsibility"></note>
 <subject authority="">
  <topic>TUNNELING</topic>
 </subject>
 <classification>624.121 (063)</classification>
 <identifier type="isbn">0415391245</identifier>
 <location>
  <physicalLocation>Perpustakaan Direktorat Bina Teknik Jalan dan Jembatan Direktorat Jenderal Bina Marga - Kementerian Pekerjaan Umum (NPP: 3273244A00000001)</physicalLocation>
  <shelfLocator>624.121 (063)</shelfLocator>
 </location>
 <recordInfo>
  <recordIdentifier>20470</recordIdentifier>
  <recordCreationDate encoding="w3cdtf">2016-04-29 10:30:01</recordCreationDate>
  <recordChangeDate encoding="w3cdtf">2021-05-17 09:25:52</recordChangeDate>
  <recordOrigin>machine generated</recordOrigin>
 </recordInfo>
</mods>
</modsCollection>