<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="20466">
 <titleInfo>
  <title>Trial Works on Soil Consolidation Before Tunnel Construction</title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>Argal, E.S.</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <name type="Personal Name" authority="">
  <namePart>Ashikhmen, V.A.</namePart>
  <role>
   <roleTerm type="text">Additional Author</roleTerm>
  </role>
 </name>
 <name type="Personal Name" authority="">
  <namePart>Korolev, V.M.</namePart>
  <role>
   <roleTerm type="text">Additional Author</roleTerm>
  </role>
 </name>
 <name type="Personal Name" authority="">
  <namePart>Pronina, L.E.</namePart>
  <role>
   <roleTerm type="text">Additional Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">London</placeTerm>
  </place>
  <publisher>Taylor &amp; Francis Group,</publisher>
  <dateIssued>2006</dateIssued>
 </originInfo>
 <language>
  <languageTerm type="code">en</languageTerm>
  <languageTerm type="text">English</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Text</form>
  <extent>351-357p.</extent>
 </physicalDescription>
 <relatedItem type="series">
  <titleInfo/>
  <title>Proceedings Geotechnical Aspects of Underground Construction in Soft Ground</title>
 </relatedItem>
 <note>This paper describes the results of the trial workd conducted in a test area, which is a part of Krasnopresnensky prospect including an automobile tunnel combined with one of the metro lines that are being built in Moscow. The objective of these works was to detemine the technological regularity of soil consolidation before inter-tunnel connections are friven. Basics of the injection technology were checked in the laboratory. From the results, the composition and penetrating capacity of the injected micro-cement grout suspension were determinated. The injection and control works in the test area have indicated that the ground may be successfully fixed by appying a manchette injection method of micro-cement-based grout.&#13;
LOKASI:&#13;
Ruang Koleksi Umum&#13;
Rak: 2</note>
 <note type="statement of responsibility"></note>
 <subject authority="">
  <topic>TUNNEL CONSTRUCTION</topic>
 </subject>
 <classification>624.121 (063)</classification>
 <identifier type="isbn">0415391245</identifier>
 <location>
  <physicalLocation>Perpustakaan Direktorat Bina Teknik Jalan dan Jembatan Direktorat Jenderal Bina Marga - Kementerian Pekerjaan Umum (NPP: 3273244A00000001)</physicalLocation>
  <shelfLocator>624.121 (063)</shelfLocator>
 </location>
 <recordInfo>
  <recordIdentifier>20466</recordIdentifier>
  <recordCreationDate encoding="w3cdtf">2016-04-29 09:54:47</recordCreationDate>
  <recordChangeDate encoding="w3cdtf">2021-05-17 08:56:04</recordChangeDate>
  <recordOrigin>machine generated</recordOrigin>
 </recordInfo>
</mods>
</modsCollection>