No image available for this title

Text

Compressed Air Driving and Monitored Soft Ground and Groundwater Behaviour



In the course of the a new highspeed railway line the Tunnel Offenbau is built in difficult ground and groundwater conditions. Due to these conditions and the bordering village Offenbau the Tunnel is constructed in top cover technique combined with compressed air in order to guarantee the serciveability of the housing at all times. The construction of the tunnel was accompanied by an extensive monitoring programme, which included the monitoring of tunnel and the neighbouring constructions. Moreover, the monitoring is required for the conservation of evidence of the housings and all structural objects.
LOKASI:
Ruang Koleksi Umum
Rak: 2


Ketersediaan

Tidak ada salinan data


Informasi Detail

Judul Seri
Proceedings Geotechnical Aspects of Underground Construction in Soft Ground
No. Panggil
624. 121 (063)
Penerbit Taylor & Francis Group, : London.,
Deskripsi Fisik
289-295p.
Bahasa
English
ISBN/ISSN
0-415-39124-5
Klasifikasi
624. 121 (063)
Tipe Isi
-
Tipe Media
-
Tipe Pembawa
-
Edisi
-
Subjek
Info Detail Spesifik
-
Pernyataan Tanggungjawab

Versi lain/terkait

Tidak tersedia versi lain




Informasi


DETAIL CANTUMAN


Kembali ke sebelumnyaDetail XMLKutip ini