Detail Cantuman
Pencarian Spesifik
Computer Software
Risk based bridge planning in Minnesota
The Minnesota Department of Transportation (Mn/DOT) manages an inventory of more than
19,000 structures. In response to 2010 state legislation, the Bridge Replacement and Improvement Management
(BRIM) system was developed as a tool to rank potential bridge projects by directly considering the risk
of an interruption to service in Mn/DOT’s long term planning process. As a functioning communicative tool,
this database will help project stakeholders to understand how Mn/DOT prioritizes and programs bridge
projects for future contracts. The database and tool contain a risk assessment model to provide a consistent
rating and ranking of Minnesota bridges using the principles of risk management. BRIM consists of a set of
risk evaluation models that consider the major natural and man-made hazards affecting the bridge inventory:
advanced deterioration of deck, superstructure, and substructure; scour; fracture criticality; fatigue; overweight
and over-height trucks
Ketersediaan
| 0000020804 | My Library | Tersedia |
Informasi Detail
| Judul Seri |
Bridge Maintenance, Safety, Management, Resilience And Sustainability
|
|---|---|
| No. Panggil |
-
|
| Penerbit | Taylor & Francis : ., 2012 |
| Deskripsi Fisik |
-
|
| Bahasa |
English
|
| ISBN/ISSN |
-
|
| Klasifikasi |
624.21(063)
|
| Tipe Isi |
-
|
| Tipe Media |
-
|
|---|---|
| Tipe Pembawa |
-
|
| Edisi |
-
|
| Subjek | |
| Info Detail Spesifik |
-
|
| Pernyataan Tanggungjawab |
-
|
Versi lain/terkait
Tidak tersedia versi lain






