No image available for this title

Computer Software

Risk based bridge planning in Minnesota



The Minnesota Department of Transportation (Mn/DOT) manages an inventory of more than
19,000 structures. In response to 2010 state legislation, the Bridge Replacement and Improvement Management
(BRIM) system was developed as a tool to rank potential bridge projects by directly considering the risk
of an interruption to service in Mn/DOT’s long term planning process. As a functioning communicative tool,
this database will help project stakeholders to understand how Mn/DOT prioritizes and programs bridge
projects for future contracts. The database and tool contain a risk assessment model to provide a consistent
rating and ranking of Minnesota bridges using the principles of risk management. BRIM consists of a set of
risk evaluation models that consider the major natural and man-made hazards affecting the bridge inventory:
advanced deterioration of deck, superstructure, and substructure; scour; fracture criticality; fatigue; overweight
and over-height trucks


Ketersediaan

0000020804My LibraryTersedia

Informasi Detail

Judul Seri
Bridge Maintenance, Safety, Management, Resilience And Sustainability
No. Panggil
-
Penerbit Taylor & Francis : .,
Deskripsi Fisik
-
Bahasa
English
ISBN/ISSN
-
Klasifikasi
624.21(063)
Tipe Isi
-
Tipe Media
-
Tipe Pembawa
-
Edisi
-
Subjek
Info Detail Spesifik
-
Pernyataan Tanggungjawab

Versi lain/terkait

Tidak tersedia versi lain




Informasi


DETAIL CANTUMAN


Kembali ke sebelumnyaDetail XMLKutip ini