<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="20029">
 <titleInfo>
  <title>Smart system of bridge strain monitoring during construction and service</title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>Olaszek, P.</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text"></placeTerm>
  </place>
  <publisher>Taylor &amp; Francis</publisher>
  <dateIssued>2012</dateIssued>
 </originInfo>
 <language>
  <languageTerm type="code">id</languageTerm>
  <languageTerm type="text">Indonesia</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Filmstrip</form>
  <extent></extent>
 </physicalDescription>
 <relatedItem type="series">
  <titleInfo/>
  <title>Bridge Maintenance, Safety, Management, Resilience And Sustainability</title>
 </relatedItem>
 <note>The presented system is intended to monitor bridges in two cycles of their operation: construction&#13;
and service. It consists of independent recorders which register strain/stress, acceleration and temperature.&#13;
The recorders operate in tandem with a portable outside computer only in phases of preparation, testing&#13;
and saving measurements. They are characterised by high reliability of measurement achieved due to a duplication&#13;
method of strain/stress measurement and a reasonably low price. The paper presents some examples of&#13;
system trial implementations. The first instance concerns monitoring of structure creation, from system installation&#13;
in steel structure factory through transport of particular elements, assembly of structure on a construction&#13;
site and concreting of a deck to a disassembly of shuttering. The second example focuses on the monitoring&#13;
of a bridge construction via the process of launching steel girders with a composite reinforced concrete&#13;
deck slab and during bridge load testing and service.</note>
 <subject authority="">
  <topic>BRIDGE MONITORING</topic>
 </subject>
 <classification>624.21(063)</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>Perpustakaan Direktorat Bina Teknik Jalan dan Jembatan Direktorat Jenderal Bina Marga - Kementerian Pekerjaan Umum (NPP: 3273244A00000001)</physicalLocation>
  <shelfLocator></shelfLocator>
  <holdingSimple>
   <copyInformation>
    <numerationAndChronology type="1">0000020752</numerationAndChronology>
    <sublocation>My Library</sublocation>
    <shelfLocator></shelfLocator>
   </copyInformation>
  </holdingSimple>
 </location>
 <recordInfo>
  <recordIdentifier>20029</recordIdentifier>
  <recordCreationDate encoding="w3cdtf"></recordCreationDate>
  <recordChangeDate encoding="w3cdtf"></recordChangeDate>
  <recordOrigin>machine generated</recordOrigin>
 </recordInfo>
</mods>
</modsCollection>