<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="19517">
 <titleInfo>
  <title>Monitoring Underground Construction:</title>
  <subTitle>A Best Practice Guide</subTitle>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>British Tunnelling Society</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text"></placeTerm>
  </place>
  <publisher>ICE Publishing</publisher>
  <dateIssued>2011</dateIssued>
 </originInfo>
 <language>
  <languageTerm type="code">en</languageTerm>
  <languageTerm type="text">English</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Text</form>
  <extent>ix+58p.: Illus.; 21 x 29 cm</extent>
 </physicalDescription>
 <note>Underground construction projects involve complex geotechnical conditions and high levels of uncertainty, making effective monitoring essential to ensure safety, performance, and cost control. Monitoring Underground Construction: A Best Practice Guide presents a comprehensive framework for planning, implementing, and managing monitoring systems throughout the lifecycle of underground works, including tunnels, shafts, and deep excavations. The guide outlines key principles of observational methods, selection of appropriate instruments, data acquisition, interpretation, and decision-making processes. Emphasis is placed on risk-based monitoring strategies, integration of monitoring data with design assumptions, and timely response to deviations from expected behavior. Best practices are illustrated through practical examples and lessons learned from past projects, highlighting common challenges such as data reliability, communication gaps, and stakeholder coordination. By promoting a systematic and proactive approach, this guide aims to support engineers, contractors, and project owners in improving construction safety, optimizing design adaptations, and enhancing overall project performance in underground construction.&#13;
&#13;
LOKASI: Lemari Referensi&#13;
RF. 17</note>
 <note type="statement of responsibility"></note>
 <subject authority="">
  <topic>TUNNELLING</topic>
 </subject>
 <classification>R 624.19(036)</classification>
 <identifier type="isbn">9780727741189</identifier>
 <location>
  <physicalLocation>Perpustakaan Direktorat Bina Teknik Jalan dan Jembatan Direktorat Jenderal Bina Marga - Kementerian Pekerjaan Umum (NPP: 3273244A00000001)</physicalLocation>
  <shelfLocator>R 624.19(036) BRI m</shelfLocator>
  <holdingSimple>
   <copyInformation>
    <numerationAndChronology type="1">0000020232</numerationAndChronology>
    <sublocation>My Library (Lemari Referensi)</sublocation>
    <shelfLocator>R 624.19(036) BRI m</shelfLocator>
   </copyInformation>
  </holdingSimple>
 </location>
 <slims:image>WhatsApp_Image_2026-01-29_at_13.55.20.jpeg.jpeg</slims:image>
 <recordInfo>
  <recordIdentifier>19517</recordIdentifier>
  <recordCreationDate encoding="w3cdtf"></recordCreationDate>
  <recordChangeDate encoding="w3cdtf">2026-01-29 13:56:07</recordChangeDate>
  <recordOrigin>machine generated</recordOrigin>
 </recordInfo>
</mods>
</modsCollection>