<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="18256">
 <titleInfo>
  <title>Guidelines for dowel alignment in concrete pavements. NCHRP Report 637.</title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>Khazanovich, Lev</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text"></placeTerm>
  </place>
  <publisher>TRB</publisher>
  <dateIssued>2009</dateIssued>
 </originInfo>
 <language>
  <languageTerm type="code">id</languageTerm>
  <languageTerm type="text">Indonesia</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Flash Card</form>
  <extent>49p.</extent>
 </physicalDescription>
 <note>Inspection of pavements in several states revealed that misalignment of dowels generally occurs regardless of the  placement method. These inspections also reveled that slab cracking and other forms of distress may not always occus as a result of  such misalignment.  These guidelines were to address all forms and combinations of dowel misalignment. The guidelines provide a simple methodology to account for the effects of dowel misalignment in estimating pavement performance. The methodology uses an equivalent diameter concept in which dowel diameter is reduced to account for the effects of misalignment. The dowel diameter reduction factor depends on the type and level of misalignment. Equations for determining the reduction factor for different types of misalignments were developed based on the results of field, laboratory and finite element analysis. Pavement performance can then be estimated using pavement analysis predictions for the reduced dowel diameter</note>
 <subject authority="">
  <topic>CONCRETE PAVEMENTS</topic>
 </subject>
 <classification>625.7(047.31)</classification>
 <identifier type="isbn">9780039117852</identifier>
 <location>
  <physicalLocation>Perpustakaan Direktorat Bina Teknik Jalan dan Jembatan Direktorat Jenderal Bina Marga - Kementerian Pekerjaan Umum (NPP: 3273244A00000001)</physicalLocation>
  <shelfLocator>625.7(047.31) Kha n</shelfLocator>
  <holdingSimple>
   <copyInformation>
    <numerationAndChronology type="1">0000018908</numerationAndChronology>
    <sublocation>My Library</sublocation>
    <shelfLocator>625.7(047.31) Kha n</shelfLocator>
   </copyInformation>
   <copyInformation>
    <numerationAndChronology type="1">0000020103</numerationAndChronology>
    <sublocation>My Library</sublocation>
    <shelfLocator>625.7(047.31) Kha n</shelfLocator>
   </copyInformation>
  </holdingSimple>
 </location>
 <recordInfo>
  <recordIdentifier>18256</recordIdentifier>
  <recordCreationDate encoding="w3cdtf"></recordCreationDate>
  <recordChangeDate encoding="w3cdtf"></recordChangeDate>
  <recordOrigin>machine generated</recordOrigin>
 </recordInfo>
</mods>
</modsCollection>