Detail Cantuman
Pencarian SpesifikComputer Software
Planning and engineering for the future: capacity increase and cable replacement at the Bronx-Whitestone bridge
Several traffic studies of the BWB, the Throgs Neck bridge and the region's highway network have been performed which indicate that the traffic demand will continue to increase in the region, particularly at the BWB. based on these predictions, several planning studies investigating the feasibility of providing for the future traffic demands have been performed. Two main concepts were investigated for increasing traffic capacity; the addition of a second level and the widening of the bridge. Both concepts require cable replacement to accommodate the heavier loads. Both concepts have myriad associated technical challenges as well as even more significant planning issues such as access, environmental impacts, maintenance of traffic, and flexibility for accommodating future traffic demand
Ketersediaan
0000018359 | 624.21(063) Lor p | My Library | Tersedia |
Informasi Detail
Judul Seri |
Advances In Cable-supported Bridges
|
---|---|
No. Panggil |
624.21(063) Lor p
|
Penerbit | Taylor & Francis : ., 2006 |
Deskripsi Fisik |
pp.145-162
|
Bahasa |
English
|
ISBN/ISSN |
-
|
Klasifikasi |
624.21(063)
|
Tipe Isi |
-
|
Tipe Media |
-
|
---|---|
Tipe Pembawa |
-
|
Edisi |
-
|
Subjek | |
Info Detail Spesifik |
-
|
Pernyataan Tanggungjawab |
-
|
Versi lain/terkait
Tidak tersedia versi lain