Detail Cantuman
Pencarian SpesifikArt Original
Implementation of startup procedures in the laboratory
As part of the Federal Highway Administration's (FHWA) Long-Term Pavement Performance Program (LTPP materials characterization effort, a quality control/quality assurance (QC/QA) procedure was developed to verify the proficiency of laboratory equipment and personnel in performing resilient modulus testing. This effort is documented in report FHWA Rd-96-176, "Resilient Modulus of Unbound Materials (LTPP Proticol P46) Laboratory Starup and quality control procedure" (Alavi, et al. 1997). Since issuance of that report, a great deal of experience has been gathered in using the procedure. This present paper provides an outline of the procedure, the ratinale behind the procedure, and documents recent changes that have been developed by the authors. The paper also discusses issues to look for when implementing the starup procedure. Finally, a brief list of issues that have been found by using the procedure is presented