 <titleInfo>
  <title>Optimisation of the selective competitive tendering system by the construction client</title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>Johnston,  R.H.</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text"></placeTerm>
  </place>
  <publisher>TRRL</publisher>
  <dateIssued>1978</dateIssued>
 </originInfo>
 <language>
  <languageTerm type="code">id</languageTerm>
  <languageTerm type="text">Indonesia</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Chart</form>
  <extent>56 p.; fig.; tab.</extent>
 </physicalDescription>
 <relatedItem type="series">
  <titleInfo/>
  <title>Trrl Lr 855</title>
 </relatedItem>
 <note>The selective competitive tendering system is the most common method of contractor selection for capital works such as highways. By choosing the identity and number of contractors who shall tender, the client can control the competition to give the best value for money. For a client with a continuing program of work this optimisation need not conflict with the objective of contractors can do this by matching his demand for work to the available resources, assessing the effectiveness of the tendering competition, choosing only those contractors to improve the accuracy of their tendering. Methods are presented to assist in these tasks and it is concluded that the optimum number of contracts to invite to tender for highway schemes is that number which can usually be expected to be fully competitive under normal trading conditions. A statistical analysis of the bids submitted for highway schemes between 1970 and 1975 revealed how the system operated and that it behaved differently when demand for construction was high compared with the period of low demand</note>
 <subject authority="">
  <topic>BRIDGES</topic>
 </subject>
 <classification>625.7(047.31)</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>Perpustakaan Direktorat Bina Teknik Jalan dan Jembatan Direktorat Jenderal Bina Marga - Kementerian Pekerjaan Umum (NPP: 3273244A00000001)</physicalLocation>
  <shelfLocator>625.7(047.31) Joh o</shelfLocator>
  <holdingSimple>
   <copyInformation>
    <numerationAndChronology type="1">0000001600</numerationAndChronology>
    <sublocation>My Library</sublocation>
    <shelfLocator>625.7(047.31) Joh o</shelfLocator>
   </copyInformation>
  </holdingSimple>
 </location>
 <recordInfo>
  <recordIdentifier>1580</recordIdentifier>
  <recordCreationDate encoding="w3cdtf"></recordCreationDate>
  <recordChangeDate encoding="w3cdtf"></recordChangeDate>
  <recordOrigin>machine generated</recordOrigin>
 </recordInfo>
</mods>
</modsCollection>