<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="1506">
 <titleInfo>
  <title>Swindon freight study:</title>
  <subTitle>assessment of possible 'no entry' controls</subTitle>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>Cundill,  M.A.</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text"></placeTerm>
  </place>
  <publisher>TRRL</publisher>
  <dateIssued>1977</dateIssued>
 </originInfo>
 <language>
  <languageTerm type="code">id</languageTerm>
  <languageTerm type="text">Indonesia</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Chart</form>
  <extent>20 p.; fig.; tab.</extent>
 </physicalDescription>
 <relatedItem type="series">
  <titleInfo/>
  <title>Trrl Lr 793</title>
 </relatedItem>
 <note>The main findings are: (1) 24 hour 'no entry' controls would be far less cost-effective than 'no entry except for access' controls, typically costing two or three times as much to obtain the same environmental gain. (2) The cost effectiveness of 24 hour 'no entry' controls would not be improved by the provision of  a simple type of transhipment centre on the town periphery. (3) Peak period 'no entry' controls would not provide a cost effective method of reducing traffic congestion during peak periods and would be ineffective in reducing goods vehicle nuisance</note>
 <subject authority="">
  <topic>FREIGHT TRANSPORT</topic>
 </subject>
 <classification>625.7(047.31)</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>Perpustakaan Direktorat Bina Teknik Jalan dan Jembatan Direktorat Jenderal Bina Marga - Kementerian Pekerjaan Umum (NPP: 3273244A00000001)</physicalLocation>
  <shelfLocator>625.7(047.31) Cun s</shelfLocator>
  <holdingSimple>
   <copyInformation>
    <numerationAndChronology type="1">0000001525</numerationAndChronology>
    <sublocation>My Library</sublocation>
    <shelfLocator>625.7(047.31) Cun s</shelfLocator>
   </copyInformation>
  </holdingSimple>
 </location>
 <recordInfo>
  <recordIdentifier>1506</recordIdentifier>
  <recordCreationDate encoding="w3cdtf"></recordCreationDate>
  <recordChangeDate encoding="w3cdtf"></recordChangeDate>
  <recordOrigin>machine generated</recordOrigin>
 </recordInfo>
</mods>
</modsCollection>